ROUTING & SITING
    Public outreach
Siting process
New right-of-way
Existing right-of-way
  RELATED RESOURCES
 
Tables RS-1 through Table RS-4 (123k pdf)
Table RS-1 -- Projects requiring new ROW (62k pdf)
Table RS-2 -- Environmental screening information on new ROW (72k pdf)
Table RS-3 -- Projects on existing ROW (66k pdf)
Table RS-4 -- Environmental screening information on existing ROW (90k pdf)
EXISTING RIGHT-OF-WAY PDF of Current Page
 

Table RS-3 lists the new, rebuilt or reconductored transmission lines requiring no new right-of-way, and whether high-level environmental screening information is provided in this report or can be found in application materials already filed with the Public Service Commission. Table RS-4 provides environmental screening information for the lines listed in Table RS-3.

 

The projects listed in Tables RS-1 through Table RS-4 do not reflect the entire number of projects included in this assessment that will require some level of environmental assessment. Rather, these projects will require selection of new rights-of-way and are likely to result in new environmental impacts. The environmental screening information highlights some of the environmental concerns that will need to be considered during any route identification process for these projects. Other projects will require environmental assessment, and those assessments will be conducted in the course of finalizing the scope for each of those projects.



 