Table ZS-4 -- 2026 Limitations
Figure ZS-8 -- Zone 2 2022-2026 Limitations
ZONE 2 - 2026 STUDY RESULTS PDF of Current Page
 

Refer to Table ZS-4 and Figure ZS-8

 

Summary of key findings 

 

  • Limitations identified will be addressed in projects outlined in the 2012 and 2016 sections.

 

There are three thermal limitations and several voltage limitations listed in Table ZS-4. The voltage and thermal limitations occur in the Munising/Newberry, eastern U.P. and Escanaba areas and will be mitigated by projects described in the 2012 and 2016 study results.

 

Please refer to the ATC Energy Collaborative – Michigan for further information.

 

Projects whose “Need date” precedes the “In-service date”

  • None

 

Projects whose “In-service date” precedes the “Need date”

  • None

 

Assessment of Steady State Compliance with NERC Standards

The mitigation plans comprised of planned, proposed and provisional projects identified for Zone 2 in this Assessment will allow the ATC system in Zone 2 to meet the steady state portions of NERC standards TPL-001 and TPL-002 in each of the five years 2012-2016, and for the 2017-2021 planning horizon.

 



 