Transmission system characteristics in Zone 4

ATC delivers power in Zone 4 with various transmission facilities including:

  • Four 345-kV lines extending from the Point Beach Nuclear Plant,
  • Two 345-kV lines extending from the Edgewater Power Plant,
  • Four 345-kV lines connecting the Gardner Park, Werner West, Morgan, and Plains Substations,
  • Two 345-kV lines from North Appleton to Werner West and Fitzgerald,
  • Three 345-kV lines connecting South Fond du Lac Substation to the Columbia, Edgewater and Fitzgerald Substations, and
  • A 138-kV network in the Fox River Valley/Green Bay area.
Transmission system limitations in Zone 4

In our analysis of Zone 4, we continue to monitor potential high voltages in the Outagamie and Calumet counties and impending low voltages in Brown County. In addition, other ongoing studies have identified several voltage and thermal limitations. The most severe limitations occur during both peak and off‑peak periods.

Electric system overview

Increases expected in population, employment – Population in Zone 4 is projected to grow 0.7 percent annually between now and 2024. Brown County is expected to realize the largest increase in population. Employment is projected to grow 1.1 percent annually in the same time period, with the largest increase projected in Brown County.

Electricity usage growing

Peak electric demand typically occurs during the summer months, although the northern portion of Zone 4 typically experiences nearly equal summer and winter peaks. Paper mills and foundries in the Green Bay and Appleton metropolitan areas are some of the largest electricity users in the zone.

Electric load is forecasted to grow at approximately 0.5 percent annually through 2025. Also, locally generated electricity is declining in the area with smaller, coal-fired generators most at risk. This includes generation owned by industries, municipalities and utilities.

Transmission projects in Zone 4

The most notable planned, proposed and provisional network projects and asset renewal projects in Zone 4, along with their projected year of completion and the factors driving the need for the projects, are listed below.

Zone 4 includes the counties of:
  • Brown , WI
  • Calumet , WI
  • Dodge (NE) , WI
  • Door , WI
  • Fond Du Lac (E) , WI
  • Kewaunee , WI
  • Manitowoc , WI
  • Marinette (S) , WI
  • Menominee , WI
  • Menominee (S) , MI
  • Oconto , WI
  • Outagamie , WI
  • Shawano (E) , WI
  • Sheboygan , WI
  • Winnebago (E) , WI

Zone 4 Planned Projects

Project DescriptionIn-service yearNeed driver
Pulliam-Glory Road 138-kV line conversion2016Overloads and low voltages
Iron Foundry 138/69‑kV Substation construction and Glenview‑Iron Foundry 69‑kV line extension 2016T‑D interconnection
Bay Lake: North Appleton-Morgan 345‑kV and 138‑kV line construction2019Overloads and low voltages
Creekview Substation: 138-kV line construction to serve T‑D interconnection2017T‑D interconnection 2017
Branch River 345‑kV Substation construction2018Accommodate new generation

Zone 4 Proposed Projects

Project DescriptionIn-service yearNeed driver
Ogden St.-Bayshore 69-kV line construction2018Provide network service
Proposed Projects
[table “16” not found /]

Zone 4 Asset Renewal Projects

Project DescriptionIn-service yearNeed driver
Dyckesville-Sawyer 69-kV line rebuild2016Condition and performance
North Appleton-Butte des Morts 138-kV line rebuild2017Condition and performance
Finger Road-Canal 69-kV line rebuild2019Condition and performance